MicroLiving Installation at Lawndale

One of two full-scale PREFAB installations exhibited at the Lawndale Center in Houston, as part of the MASSIE / PEREZ collaborative studio. The work was on display from June – July, 2009. This modular, prefab steel frame was constructed in approximately 6 weeks by a 4-person student team, utilizing welded sub-modules or “cartridges” bolted together to achieve a compound curved surface. Additional photos may be found on my flicker site.